Remembering VFW Post 10216

The Posts "HeyDays"

"The Flood" Summer 2000

In the summer of 2000 the remnants of a typhoon went through and flooded much of the Osan AB area, 21 inches of rain fell in 36 hours. Due to the design of the VFW exhaust vents, water filled the post up to the ceiling. After a massive cleanup effort from our dedicated members, we were back up and running in three months.

Florida Rhapsody Street 6 / 4
contact@yoursite.com
+023 (132) 547263

© Copyright 2025 Mobirise - All Rights Reserved